Elysea Suites
Overview
New Development: Prices from 1,056,000 € to 2,206,000 €. [Beds: 2 - 3] [Baths: 2 - 3.5] [Built size: 92.00 m2 - 131.00 m2]
Located in a privileged position on the elevated side of Mijas Costa, this exclusive residential project offers panoramic views of the Mediterranean and a lifestyle designed for those who appreciate comfort, elegance and outdoor living. The location, just minutes from Fuengirola and Marbella, provides easy access to beaches, golf courses and one of the area's top commercial centres, with a wide range of shops, restaurants and entertainment.
The architectural design combines modern lines with open, luminous interiors. Spacious layouts, large windows and generous terraces create a seamless connection between indoor and outdoor spaces. Select ground-floor units offer private gardens, while others feature optional plunge pools and solariums with stunning views.
Residents enjoy access to exceptional communal facilities including a gym, wellness spa and a beautifully designed pool area with views over the sea. The gardens, created in collaboration with the Málaga Botanical Park Association, blend sustainability with beauty to form an inviting natural environment.
Each home is finished to high standards, with features such as underfloor heating, large-format porcelain tiles and premium fittings in kitchens and bathrooms. This is an ideal setting for enjoying peace, privacy and the relaxed rhythm of Mediterranean life in a well-connected and sought-after area.
START OF CONSTRUCTION: Q4 2025
END OF CONSTRUCTION: Q4 2027
Key facts
- Price from
- €1,056,000 – €2,206,000
- Bedrooms
- 2–3 Beds
- Bathrooms
- 2–3.5
- Built size
- —
- Property types
- Apartment
- Completion
- Q4 2027
- Developer
- —
Location
Loading map…
- Marbella Old Town16 km
- Puerto Banús23 km
- Málaga Airport (AGP)26 km
- Málaga City Centre35 km
- Estepona Port42 km
- Puerto de la Duquesa50 km
- Sotogrande Marina57 km
- Gibraltar Airport (GIB)70 km
Straight-line distances, approximate.
Construction status
- Coming soon
- Launch
- Off-plan
- Under construction
- Completed
- Completion date
- Q4 2027
- Status
- Off-plan
Floor plans & masterplan
Floor plans, masterplan and brochure
Sent with the latest price list – including unit-by-unit plans and orientation.
You may also like